Ball Valve Maintenance and Troubleshooting
The maintenance steps for Batu Valve ball valves are compiled from the API ball valve installation, operation and maintenance manual.
Maintenance is not carried out without the valve drawing and instructions. The steps below show the general sequence; the instructions for the specific product take precedence.
Maintenance intervals
Routine inspection: At least every two years from delivery
Underground valves: Preventive maintenance and inspection once a year
After service: Next maintenance date not more than 12 months ahead
Corrective maintenance: Not scheduled; carried out on failure
Items to check on site
- Paint integrity
- Dust deposits
- Rust and external corrosion
- Condition of vent and drain fittings
- Lubrication of threads and bearings
- Internal and external leakage
Inspection and maintenance intervals
| Condition | Interval |
|---|---|
| Routine maintenance inspection | At least every two years from the date of delivery |
| Underground valves | Routine maintenance cannot be carried out; preventive maintenance and inspection once a year |
| After service or maintenance | The next maintenance date entered on the tag does not exceed 12 months |
| Corrective maintenance | Not scheduled; it is the intervention carried out when the valve fails to operate |
The stem is lubricated periodically according to ambient conditions. Natural gas ball valves have no fixed periodic maintenance interval; if stem sealing decreases after long service, the stem nut is tightened slightly.
Before maintenance
- The valve is depressurised.
- The temperature is checked at the vent and drain.
- Electrical connections are isolated.
- The valve is cleaned.
In preparation, site safety (flammable, pressurised or toxic environment), torque equipment, lubricant and cleaner, and the gearbox and actuator manuals where applicable, are made ready.
Body gasket replacement
- The line is isolated.
- The body and closure flange are marked on the right and left so that they can be reassembled in the same position.
- The studs are removed and the old gasket is discarded.
- The contact surface is inspected and cleaned (surface roughness Ra 1.6 – 3.2).
- The new gasket is fitted without the use of sealing compound.
- The closure is assembled with the ball open and tightened in accordance with the torque table.
Dismantling, reassembly and final adjustment
- Parts are marked and numbered so that their orientation is clear.
- Any corrosion or deformation is photographed and recorded.
- Parts are cleaned without damage; a part to be replaced is compared with its spare.
- After reassembly the open-close direction markings are checked.
- The opening and closing torque is measured and recorded.
- A full open-close cycle and a leak check are carried out.
Emergency sealant injection
Split body API valves have injection fittings on both sides of the body. If the seat or ball surface is damaged and the valve leaks, cleaner is injected first, followed by a sealant compatible with the medium. The operation is carried out slowly, with the valve fully closed and from the high pressure side.
This is a temporary measure; the permanent solution is repair of the valve.
Vent and drain
With the valve closed, the body cavity is under pressure. The vent or drain plug is not removed until the pressure has been fully released. The medium may be toxic, corrosive or flammable; protective equipment is used and the operation is carried out by experienced personnel.
Safety and spare parts
Safety rules
- The body bolts of a valve under pressure are not touched. Trapped pressure may remain in the body of a closed valve, between the ball and the seats.
- Before dismantling, the line is isolated, the pressure is released, and lock-out and tag-out are applied.
- On a hot line, work waits until the body has cooled.
- With toxic or flammable media, discharge is made to a closed system.
- On an actuated valve, the power supply is isolated.
Spare parts holding
Recommended spare parts: body flange gasket, stem packing set, seat rings and body stud and nut set. Parts are ordered by valve serial number, size and pressure rating. Seats and packing that have been removed are not reused.
Troubleshooting
| Symptom | Possible cause | Action |
|---|---|---|
| Line passes with the valve closed | Valve left partly open; PTFE seats damaged | Operate fully open or fully closed; service for seat replacement |
| Line passes with the valve closed | Solid particle trapped between seat and ball; surface scored | Strainer on the line; sealant injection as a temporary measure; repair as the permanent solution |
| Leakage at the body-closure joint | Gasket damage; contact surface dirty or damaged; closure not reassembled in its original position | Gasket replacement: dismantling with marking, surface cleaning, torque table |
| Leakage at the flange connection | Misalignment; bolts not tightened crosswise; old or deformed gasket | Alignment, crosswise tightening to torque, new gasket |
| Valve stiff to operate, high torque | Aged lubricant and foreign matter in the sealing area | Cleaner and lubrication; stem lubrication |
| Lever passes the stop pin, or pin damaged | Lever forced after resting against the pin | Check of pin and lever |
| Erosion inside the valve | Medium with solid particles, high velocity | Strainer; review of material and type selection |
| Stem sealing decreasing (natural gas, steel) | Tightness in the stuffing box decreases over time | The stem nut is tightened slightly |
| No seal can be achieved | Ball and O-ring damage | The valve is removed from the line |
| Rust after long storage | Unpainted surfaces not oiled in storage exceeding six months | Corrosion-inhibiting oil; indoor, dry storage |
Removal from the line and disposal
The valve is removed from the line and cleaned with high pressure steam before being dismantled. Metal parts are recycled; plastic and elastomer parts are disposed of in accordance with the regulations.
Frequently asked questions
A routine maintenance inspection is carried out at least every two years from the date of delivery. Underground valves require preventive maintenance and inspection once a year. After maintenance, the next maintenance date entered on the tag does not exceed 12 months.
Damage to the PTFE seats caused by leaving the valve partly open, and a solid particle in the line becoming trapped between the seat and the ball and scoring the surface.
Aged lubricant and foreign matter may have accumulated in the sealing area; cleaner and lubrication are applied and the stem is lubricated. The lever is not forced by extending it with a pipe.
No. Injection stops the leak temporarily; the permanent solution is repair of the valve.
- InstructionsAPI 6D Ball Valve Maintenance & Safe Use Instructions
- InstructionsSteel Ball Valve Maintenance & Safe Use Instructions
- InstructionsMonoblock Ball Valve Maintenance & Safe Use Instructions
- InstructionsNatural Gas Ball Valve Maintenance & Safe Use Instructions
- InstructionsAll instructions for use
See also
Select the model, pressure, connection and size; we will prepare your quotation.