Preface

DBB (Double Block and Bleed) Ball Valve Operation and Maintenance Instructions

These instructions have been prepared to ensure the safe and efficient use, installation, operation and maintenance of Api 6D DBB (Double Block and Bleed) ball valves. Careful reading and adherence to the following guidelines are critical for personnel safety and equipment longevity.

Important Note: This guide provides general guidelines. The end user is responsible for the proper selection, sizing, installation, operation and maintenance of the valve. This document should be read in conjunction with the additional instructions provided with the product.

Considerations for selecting DBB ball valves

The selection of DBB valves should be based on the characteristics of the environment and of the fluid in which they will be used.

  • Fluid Type: The valve material and sealing elements should be selected according to whether the fluid is liquid, gas, air or a dense fluid containing solid particles, and whether it is corrosive.
  • Temperature and Concentration: The maximum and minimum temperatures and the concentration of the fluid should be known, and the valve should be selected accordingly.
  • Operating Pressure: The maximum operating pressure of the fluid passing through the valve must be determined, and the valve must be selected accordingly.
  • Connection Type: The line connection type (threaded, flanged, socket, welded or union) must be determined.
  • Size and Fluid Quantity: The valve size and passage type (full bore, reduced bore) should be selected according to the amount of fluid to be passed per hour.
  • Compliance with Standards: The valve should comply with international standards such as API, DIN and EN.

Packaging, storage and transportation

The packaging, storage and transportation of valves directly affect the valve’s performance and service life.

Packaging

  • Packaging Protection: Valves are protected against foreign objects entering the line connection points. Do not remove the packaging and covers until the valve is connected to a cleaned line.

Storage

  • Valves must never be stacked on top of each other.
  • Valves must never be left in a half-open position. Otherwise, in a half-open valve the ball surface may crush the PTFE seats, which increases the risk of internal leakage.
  • It is recommended that valves shipped to the customer be stored in a closed storage area, protected from water, moisture and humidity.
  • For long-term storage (minimum 6 months), the valve’s line connection covers should be opened, unpainted areas should be lubricated with corrosion-preventive oils, and the flanges should be closed again with covers.

Transportation

  • When opening the boxes and inspecting the valves, make sure that there is no damage caused by transportation.
  • When removing the valve from the box or pallet, the accessories on it should be protected from crushing or impact.
  • When opening the box, cloth slings should be used to prevent damage to the valve.
  • When lifting the valves, lifting devices suitable for the weight of the valve should be used.
  • Ball valves weighing more than 25 kg must be transported using their own lifting points (transportation lugs), which are designed to carry the weight of the valve.
  • For valves over 25 kg without transportation lugs, lifting can be done using the stud holes in the flanges used for connection to the installation.
  • For valve and workplace safety, the lifting equipment must always be checked twice before each lifting operation.
  • The valve flange protection must never be removed during lifting / transportation, to prevent foreign objects from entering the valve.
  • The gearbox and actuator must not be used to lift the valve.

Points to consider when installing DBB ball valves

The installation of DBB valves is of great importance for correct and safe operation.

Installation

  • Line Cleaning: Before installing the valve, the pipeline must be cleaned with compressed air or steam to remove any burrs, rust, foreign objects and dirt that may be present inside it.
  • Label Information Check: The valve label information (standard, pressure class, diameter, etc.) should be compared with the pipeline information, and compatibility should be verified.
  • Removal of Flange Covers: The labels / covers on both flanges of the new valve to be installed should be removed.
  • Flow Direction: If a flow direction is indicated on the valve, it should be installed in the flow direction of the pipeline. If not indicated, it can be installed in either direction.
  • Axis Alignment: The axes of the pipes to be installed and the hole axes of the connection element to be used must be aligned. Axis misalignments can cause excessive stress on the valve and compromise its sealing.
  • Flange Connections: If the connection element is a flange, the bolts should be tightened crosswise to eliminate the gaps and then tightened crosswise to the specified torque values (see Section 6 for the tightening sequence and torque table).
  • Valve Position: The valve to be installed should be in the open position, and the handle should be aligned with the flow direction.
  • Inlet Side: The valve should be installed with the flange side carrying the valve’s technical information as the inlet side; the other side should then be mounted in the system without allowing tensile stress to develop.

Sealing Elements

  • A sealing element suitable for the type and pressure of the fluid must be selected.
  • The surfaces of the sealing element to be used in flange connections must be smooth.
  • Deformed or previously removed sealing elements must not be used; new ones must be installed.
  • When installing the sealing element, care must be taken not to obstruct the valve bore.

Leakage Control

Leakage control must be performed by testing at 1.5 times the rated pressure specified on the label.

DBB ball valve use and operation

Due to the special design of DBB valves, extra care is required during use.

Double Block and Bleed Principle

  • DBB valves include two independent block valves (ball valves) and a bleed valve between them for safe isolation of the line.
  • When isolating the line, both block valves must first be brought to the fully closed position.
  • Then the bleed valve must be opened to release the pressure in the cavity between the two block valves. This confirms that the line is fully isolated and safe.

Operating Rules

  • Valve Position: The valve must be left in the fully open or fully closed position. Owing to the valve’s operating principle, a valve left in the partially open position damages the PTFE ball seals and causes leakage.
  • Force Application: Apply force to the valve handles only in the direction of the arrow, for the opening and closing positions. Do not apply force once the handle rests against the stop pin.
  • Pressure Control: The operating conditions are the values indicated on the valve as the maximum operating pressure in BAR.
  • Operator Safety: The operator must use protective equipment appropriate to the chemical and physical effects to which he or she may be exposed.
  • Emergency Release: If a safety valve is fitted to prevent the uncontrolled release of fluid at temperatures and pressures that could harm human health, it is recommended that this safety equipment be connected to an appropriate manifold so that the released fluid can be controlled. If there is no release connection, do not use the vent and drain plugs to release pressure from the body cavities.

Periodic inspection and general maintenance

A regular inspection and maintenance programme is required to maintain the design life of the valve.

General Inspection

Depending on the service conditions and the operating frequency of the valve, the following checks should be performed in the field, partially or completely:

  • Paint integrity
  • Dust deposits
  • Signs of rust, external corrosion and oxidation
  • Condition of the vent and drain parts
  • Lubrication of screw threads and bearings
  • Internal and external leaks

Periodic Inspection Frequency

Routine maintenance inspections must be performed at least once every two years from the delivery date. Underground valves cannot be subjected to routine maintenance, but a preventive maintenance and inspection programme is required once a year.

Pre-Maintenance Preparation

Before any maintenance:

  • The valve pressure must be reduced.
  • The temperature in the vent and drain lines must be checked.
  • Electrical connections must be disconnected.
  • The valve must be cleaned.

Failure to comply with any of these procedures may pose a serious health and safety hazard to personnel.

Additional Maintenance (DBB Specific)

  • Bleed Valve Maintenance: The bleed valve must be checked regularly to ensure that it is functioning properly, and cleaned if necessary. If there are signs of jamming or blockage, immediate action must be taken.
  • Body Cavity Bleed: During maintenance or repair, after both block valves have been closed, make sure that the body cavity has been drained and the pressure has been reduced to zero.

Bolt tightening sequence and torque values

Bolt tightening torques (N·m) according to bolt grade

Thread Wrench N (mm) Allen key A (mm) Tightening torque by bolt grade (N·m)
3.6 4.6 5.6 5.8 6.8 8.8 9.8 10.9 12.9
M1.6 3.2 – 0.06 0.08 0.09 0.12 0.15 0.19 0.22 0.27 0.32
M2 4 – 0.13 0.15 0.19 0.25 0.29 0.39 0.42 0.53 0.64
M2.5 5 – 0.22 0.29 0.36 0.48 0.58 0.78 0.87 1.09 1.31
M3 5.5 – 0.38 0.51 0.63 0.84 1.01 1.35 1.52 1.90 2.27
M4 7 – 0.71 0.95 1.19 1.59 1.91 2.54 2.86 3.57 4.29
M5 8 – 1.71 2.28 2.85 3.80 4.56 6.09 6.85 8.56 10.30
M6 10 – 2.94 3.92 4.91 6.54 7.85 10.50 11.80 14.70 17.70
M8 13 – 7.11 9.48 11.90 15.80 19.00 25.30 28.40 35.50 42.70
M10 17 8 14.30 19.10 23.80 31.80 38.10 50.80 57.20 71.50 85.80
M12 19 10 24.40 32.60 40.70 54.30 65.10 86.90 97.70 122 147
M14 22 12 39.00 52 65 86.60 104 139 156 195 234
M16 24 14 59.90 79.90 99.80 133 160 213 240 299 359
M18 27 14 82.50 110 138 183 220 293 330 413 495
M20 30 17 117 156 195 260 312 416 468 585 702
M22 32 17 158 211 264 352 422 563 634 792 950
M24 36 19 202 270 337 449 539 719 809 1011 1213
M27 41 19 298 398 497 663 795 1060 1193 1491 1789
M30 46 22 405 540 675 900 1080 1440 1620 2025 2430
M33 50 24 550 734 917 1223 1467 1956 2201 2751 3301
M36 55 27 708 944 1180 1573 1888 2517 2832 3540 4248
M39 60 27-30 919 1226 1532 2043 2452 3269 3678 4597 5517
M42 65 32 1139 1518 1898 2530 3036 4049 4555 5693 6832
M45 70 – 1425 1900 2375 3167 3800 5067 5701 7126 8551
M48 75 36 1716 2288 2860 3813 4576 6101 6864 8580 10296
M52 80 36 2210 2947 3684 4912 5895 7859 8842 11052 13263
M56 85 41 2737 3650 4562 6083 7300 9733 10950 13687 16425
M60 90 46 3404 4538 5673 7564 9076 12102 13614 11018 20422
M64 95 46 4100 5466 6833 9110 10932 14576 16398 20498 24597
M68 100 50 4963 6617 8271 11029 13234 17646 19851 24814 29777
M72 105 55 6913 – 9228 – 17785 21074 – 29631 35537
M76 110 60 8275 – 11047 – 21290 25227 – – –
M80 115 65 9625 – 12849 – 24763 29341 – – –
M90 130 70 14298 – 24941 – 36271 42978 – – –
M100 145 – 19613 – 26182 – 50460 59790 – – –
M110 155 – 26391 – 35230 – 67898 80463 – – –
M120 175 – 34588 – 46174 – 88990 – – – –
M130 185 – 44300 – 59159 – 114015 – – – –
M140 200 – 55706 – 77568 – 143321 – – – –
M150 210 – 68906 – 91986 – 177281 – – – –

DBB Ball Valve Maintenance & Safe Use Instructions Document

Download as PDF (English / Turkish)

DBB Ball Valve Product Page

API 6D double block and bleed (DBB) ball valve

DBB Ball Valve Product Gallery

See More Product Images