Preface

BATUSAN emphasizes personal safety and the long service life of ball valves with this instruction manual, Installation, Operation and Maintenance Manual. This 3-Way Ball Valve Maintenance manual will provide all necessary safety guidelines for the valves, including information on handling, storage, installation, operation and 3-Way Ball Valve Maintenance. Please read it carefully before installing or maintaining the valve.

BATUSAN provides general guidelines in this manual. The end user must therefore take responsibility for the correct valve selection, sizing, installation, operation and 3-Way Ball Valve Maintenance of Batusan valve products. The end user must read this document in conjunction with the instructions supplied with the product.

Purpose

The BALL VALVE, manufactured according to the relevant standard, is a type of valve that directs, transmits or stops the flow of fluids by the movement of the ball inside its body. The purpose of this manual is to ensure that the valve is installed in accordance with the valve conditions, so that it can fulfil its working principle, and that it is operated in environments suitable for these conditions. For this purpose, information and instructions are given on the appropriate conditions and on the points to be considered.

The user is responsible for the problems and consequences arising from behaviors contrary to the specified issues, including those caused by neglected 3-Way Ball Valve Maintenance.

Working principle of “L” type and “T” type valves

“L” type 3-way ball valve

Working principle: L type valves have an “L” shaped passage channel inside the ball. This design allows the fluid to be directed to one of two different outlets. L type valves are generally used to change the flow direction by 90 degrees.

Areas of use:

  • Change flow direction
  • Directing fluid from two different sources to a single outlet
  • Directing fluid from a single source to two different outlets

Advantages: simple and reliable design, low pressure drop, easy to use.

“T” type 3-way ball valve

Working principle: T type valves have a “T” shaped passage channel inside the ball. This design allows the fluid to be directed to any one, or to two at the same time, of three different outlets. T type valves can also be used to mix fluids or to change the flow direction by 180 degrees.

Areas of use:

    • Mixing fluids
  • Change flow direction
  • Directing fluid from three different sources to a single outlet
  • Directing fluid from a single source to three different outlets

Advantages: versatile use, ability to mix fluids.

Both types follow the same 3-Way Ball Valve Maintenance procedure. Dimension and connection sizes, material data and stud torque information for both types are given in the tables of the original manual.

Storage

The 3-Way Ball Valve Maintenance instructions define the following storage conditions:

    • The boxes should be opened and the valves inside should be checked to ensure that they have not been damaged during transport.
    • If the valve is removed from the box or pallet, the accessories on the valve must be protected against any crushing or impact.
    • For valves stored for a long period (min. 6 months), the line connection covers of the valve are opened, the unpainted surfaces are lubricated with anti-corrosion oil and the flanges are closed again with the covers.
    • During shipment or storage, the weight of the product is checked and the product is shipped with a suitable carrier.

Transport

For transport, the 3-Way Ball Valve Maintenance instructions require the following precautions:

    • Cloth slings should be used when opening the box to prevent any damage to the valve.
    • When lifting the valves, it is recommended to use lifting devices suitable for the valve weight.
    • The transportation of ball valves larger than 25 kg is provided by the lifting lugs on the valve, which have their own lifting points designed to carry the load of the valve.
    • For valves over 25 kg without carrying lugs, transportation can be made through the stud holes in the connection flanges to the installation.
    • Gear box or actuator should not be used for lifting the valve.
    • For the safety of the valve and for occupational safety, the lifting equipment must always be double-checked before each lifting operation.
    • Never remove the flange protection of the valve during lifting/transport, to prevent foreign matter from entering the valve.

Points to be considered when using ball valves

The following operating points are taken from the 3-Way Ball Valve Maintenance instructions:

  • Batusan Ball Valves are protected against foreign objects entering the line connection points and are delivered clean. It is recommended not to remove the packaging and covers of the valve until you connect it to the line.
  • The valve should be left in the fully open or fully closed position. Due to its working principle, a valve left in a half-open position damages the PTFE ball seats and causes the valve to leak.
  • Apply force to the valve handle only for the opening and closing movements, in the direction of the arrow. Do not apply force once the lever rests on the stop pin.

During 3-Way Ball Valve Maintenance, note that the operating conditions are indicated on the valve; the maximum working pressure is given in BAR.

Matters to be considered in ball valve installation

Correct installation is the starting point of trouble-free 3-Way Ball Valve Maintenance; observe the requirements below.

For valve mounting

    • Before installing the valve, the line must be cleaned with compressed air or steam to remove any burrs, rust, foreign objects and dirt that may be present in the pipeline.
    • A line conformity check must be made and the line information must be compared with the information on the valve.
    • For a new valve, the labels / covers on all flanges must be removed before installation.
    • If there is a flow direction on the valve, the valve is mounted on the line to be connected to the flow direction of the line. If the flow direction is not specified on the valve, it can be installed in both directions.
    • The valve must be of a standard, pressure class and diameter suitable for the line to which it will be connected.
    • The axes of the pipes and the hole axes of the connection element to be used must be on the same axis. Example: If a flange is used as the connection element, the bolt hole axes must be on the same axis. (Excessive stresses on the valve caused by such axis misalignments will jeopardise the tightness.)
    • If the connection element is flange, the gaps are removed by tightening the bolts mutually, then they are tightened mutually at the given torque values.
    • If a space is left for the valve during installation, it must be calculated from the length of the valve to be used and the thickness of the sealing elements.
    • If the connection type is threaded, the thread length on the pipe should not be less than the valve thread length.
    • Leakage control should be performed by testing with a pressure 1.5 times the rated pressure indicated on the label.
    • Care should be taken to ensure that the valve to be installed in the installation is in the open position, and the handle should be in the flow direction.
    • The flange side of the valve to be installed in the installation, where the technical information is written, is mounted as input. Then the other side is mounted to the installation without giving the opportunity to create tensile stress.

For the flange sealing element

Sealing elements are the most frequent item in 3-Way Ball Valve Maintenance:

    • A sealing element suitable for the fluid type and pressure must be selected.
    • The surfaces of the sealing element to be used in flange connections must be smooth.
    • De-assembled, deformed sealing element should not be used, a new one should be installed.

During 3-Way Ball Valve Maintenance, when installing the sealing element, care must be taken not to obstruct the valve bore. (Sealing elements: Klingerit, PTFE, O-ring, rubber of suitable hardness.)

Periodic check and general 3-Way Ball Valve Maintenance

Inspection

A regular 3-Way Ball Valve Maintenance inspection programme is required to ensure the design life of the valve. Depending on the service conditions and the frequency of valve operation, the following checks should be carried out in the field, on individual parts and on the valve as a whole, to verify that the valve is operating correctly:

      • Paint integrity
      • Powder precipitate
      • Signs of rust, external corrosion and oxidation
      • Vent, drain parts status
      • Lubrication of screw threads and bearings
      • Internal and external leakages

Periodic check

A routine 3-Way Ball Valve Maintenance check should be carried out maximum every two years from the date of delivery. Underground valves cannot be subjected to routine 3-Way Ball Valve Maintenance, but a preventive 3-Way Ball Valve Maintenance and inspection program is required once a year.

Before any 3-Way Ball Valve Maintenance operation, the valve is depressurised and the temperature is checked from the vent and drain lines. The electrical connections are disconnected and the valve is cleaned. Failure to carry out any of these procedures can result in a serious health and safety hazard to personnel.

Generally, 3-Way Ball Valve Maintenance covers shaft and seat ring lubrication, the gearbox operation check and end connections, the body flange gasket leakage check and, if any, the leakage check of the relief and vent valves and drain plugs. If signs of nonconformity are found during the check, they are recorded in the report; the relevant persons are notified and troubleshooting service is requested.

Additional 3-Way Ball Valve Maintenance

Additional 3-Way Ball Valve Maintenance operations are not performed according to the schedule; this is the intervention performed when the valve is not working. Trained personnel should perform the above-mentioned intervention on the required dates with the appropriate documentation.

Replacement of gaskets

      • Isolate or depressurise the line; work with the valve in the open position.
    • Mark the body and the body flange on the right and left sides, in the same alignment, with permanent paint or a marker, so that these marks ensure they are reassembled in the same position. This is very important, as it guarantees sealing on the same surface. Unscrew and remove the body studs and nuts.
    • Remove the fitted cover and mark the position of the ball in accordance with the marked side (do not mark the surface in contact with the PTFE or SWG seat). Remove the old gasket and dispose of it at the general waste collection point.
    • Check the gasket contact surface for damage and deterioration. Clean the surfaces and remove any foreign material and/or debris. Clean the gasket seat with a rough cloth. Any leak at the gasket can lead to damage. To ensure a good seal, the contact surfaces must have a surface roughness between 1.6 and 3.2 Ra.
    • Install the new gasket without using any filler material.
    • Assemble the body flange of the valve with the body with the ball open. Tightening values of body-stud-nut or bolts will be according to Table 4 of the manual.

3-Way Ball Valve Maintenance preparation

    • Obtain the instructions and drawings (drawing no. / ref. no.) of the valve within the 3-Way Ball Valve Maintenance scope. 3-Way Ball Valve Maintenance must not be performed without instructions and drawings.
    • Check the safety of the 3-Way Ball Valve Maintenance area.
    • If there are any flammable or explosive substances, electric current, pressure, air pollutants or poisonous substances, warn the relevant persons to remove them.
    • Check that you have sufficient equipment for the disassembly and assembly torques (information enclosed).
    • Ensure an adequate supply of the necessary lubricants.
    • If there are gearboxes and actuators, have their catalogues and 3-Way Ball Valve Maintenance instructions available.

3-Way Ball Valve Maintenance and lubrication procedure

The 3-Way Ball Valve Maintenance instructions specify the following lubrication steps:

    • Cleaning will be carried out after safety measures have been approved. Take precautions for cleaning waste, prevent it from being dispersed into the environment.
    • If the valve is equipped with an emergency sealing system, a special-purpose, high-quality seat flush cleaner is injected into it. This removes old grease and other foreign materials, which cause leakage and high torque, from the critical sealing area.
    • With the valve in the fully closed position, special-purpose Batusan sealing grease, selected according to the type of fluid, is slowly injected into the emergency sealing system on the high-pressure side of the valve.
    • If possible, the additional sealing grease is distributed evenly over the entire ball surface by moving the ball slightly.
    • Damaged or defective emergency sealing fittings can be replaced while the valve is under line pressure. However, it must first be ensured that the check valve of the fitting is working.
    • Waste generated after lubrication must be disposed of according to the “Waste Management” procedure.

Control procedure

The control procedure in the 3-Way Ball Valve Maintenance instructions covers these steps:

    • Confirm safety precautions for control and live test.
    • If it is possible to measure the system pressure for the test, obtain the information from the source.
    • If the pressure inside the body is being relieved, perform a leakage measurement with the API 6D leakage tolerances. A bubble measurement using a tube is sufficient for this.
    • If the measurement exceeds the standard values, record a leak and suggest a repair procedure (gearbox adjustment, seat and shaft seal adjustment or seat repair lubrication, etc.).

Dismantling procedure

The 3-Way Ball Valve Maintenance instructions describe the dismantling sequence as follows:

    • Cleaning will be carried out after safety measures have been approved. Take precautions for cleaning waste, prevent it from being dispersed into the environment.
    • Clean, especially the areas to be accessed for 3-Way Ball Valve Maintenance, ensuring that they are thoroughly cleaned.
    • If there are weights and sizes that cannot be lifted and dismantled by hand, install lifting equipment.
    • Follow the recommended sequence by referring to the detailed drawings of the dismantling operation. During dismantling, always mark (with paint or pencil) and number the parts before separating them, so that their orientation can be easily understood and they can be reinstalled in the same orientation.
    • During dismantling, inspect the parts and immediately photograph any damage such as corrosion or deformation.
    • Record the actions to be taken to repair the damage and attach the photographs as evidence.
    • Remove rust and/or dirt without damaging the dismantled parts.
    • Separate the parts to be replaced and check their compatibility with the spare parts.
    • Valves that cannot be sealed have ball and o-ring damage. The valve must be disconnected from this line.

Reassembly and assembly

For reassembly, the 3-Way Ball Valve Maintenance dismantling procedure must be reversed. For the body assembly, strictly observe the warnings on the relevant technical drawing and its annexes. When in doubt, always consult the Batusan technical service or request service.

Final adjustment and checks

Close every 3-Way Ball Valve Maintenance operation with the following adjustments and checks:

  • Verify the correctness of the opening and closing direction signs.
  • Measure and record the opening and closing torques.
  • Full opening and closing check (you can do it together with sealing check).
  • Confirm safety precautions for check and live test.
  • If it is possible to measure the system pressure for the test, obtain the information from the source.
  • If the pressure inside the body is being relieved, perform a leakage measurement with the API 6D leakage tolerances. A bubble measurement using a tube is sufficient for this.

If the measurement exceeds the standard values, record a leak and suggest a repair procedure (gearbox adjustment, seat and shaft seal adjustment or seat repair lubrication, etc.).

3-Way Ball Valve Maintenance marking

Copy the 3-Way Ball Valve Maintenance records made in the maintenance document to the valve file. If service has been carried out, add it to the service annex. If spare parts have been used, add the spare part entries to the valve file and to the service form annex. Adjustment and measurement records, the opinions of the maintenance personnel and suggestions for future 3-Way Ball Valve Maintenance are to be stated on the service form.

Label the field service and record the latest 3-Way Ball Valve Maintenance date. This period should not exceed 12 months.

Decommissioning and disposal

3-Way Ball Valve Maintenance ends with decommissioning: at the end of its working life, the valve is removed from the line with a procedure appropriate to the valve type and the installation conditions. To avoid polluting the environment while dismantling the valve, equipment must be used to prevent leakage at the valve inlet and outlet from contaminating the environment. Bring the valve to a place that complies with European, national and regional standards and store it there until disposal.

The valve may contain toxic, corrosive and harmful substances; it must be cleaned with high-pressure steam before it is dismantled. Personnel must wear protective equipment appropriate to the contamination while carrying out these operations. The waste generated during this process must be disposed of in accordance with European, national, regional and municipal directives and/or waste and/or hazardous material legislation. The paint layer on the valve is removed by sandblasting.

Beyond routine 3-Way Ball Valve Maintenance, additional documents — mounting drawing (gear boxed) and parts list and definitions — are special order documents; refer to the order file.

Conclusion

Reference catalogue pages CONCLUSION If the BALL VALVE, which we call the valve of our age, is to work properly, placing a strainer (filter) in the main circuits will reduce operating costs. The BALL VALVE connected to the installation should be operated in the fully open or fully closed position to prevent possible leaks and operating costs.

3-Way Ball Valve Maintenance Documents

Download as PDF

3-Way L-Type and T-Type Ball Valve Product Page

3 way ball valve

API Specification 6D

3-Way Ball Valve Product Gallery

See More Product Images