Strainer: Installation & Maintenance Manual
CONTENTS
Our Products
Preface
BATUSAN is committed to your personal safety and to the long service life of the Strainer (Filter) with this Installation and Operation Manual. This Strainer Installation and Maintenance manual provides all necessary safety guidelines for the strainer, including information on handling, installation and operation. Please read it carefully before installing or maintaining the strainer.
BATUSAN provides general guidelines in this manual. The end user must therefore take responsibility for the correct valve selection, sizing, installation, operation and Strainer Installation and Maintenance of Batusan valve products. The end user must read this document in conjunction with the instructions supplied with the product.
Purpose
Fluids such as liquids, gases and vapours passing through pipe circuits carry some dirt with them, however little. In old pipe circuits these contaminants are mud, and rust, scale and similar deposits formed as a result of wear; pipe circuits also contain welding slag and gasket fragments. They cause destruction and damage to the valves, pumps and sensitive measuring and control instruments connected to the circuit. To prevent this damage, a strainer must be used at the inlet of every fitting in the pipe circuit.
The STRAINER (FILTER) can fulfil its working principle only if it is installed in accordance with its conditions and operated in environments suitable for these conditions. Correct assembly is also what keeps Strainer Installation and Maintenance to a minimum.
The user is responsible for the problems and consequences arising from behaviour contrary to the specified issues, including those caused by neglected Strainer Installation and Maintenance.
Considerations when selecting a strainer (filter)
The Strainer Installation and Maintenance instructions list the following selection criteria:
- Medium of use (the fluid passing through the strainer): the strainer should be selected according to whether the fluid is liquid, gas, air or a dense fluid containing solid particles, and whether it is corrosive or not.
- Concentration and temperature of the fluid (max. and min.): the maximum and minimum temperatures of the fluid passing through the strainer must be known.
- Operating pressure (max. operating pressure): the maximum pressure of the fluid passing through the strainer.
- Type of connection to the circuit: threaded, flanged, socket, welded or union.
- Size, or the amount of fluid to be passed per hour.
- Compliance with international standards: TSE, API, DIN, EN, ANSI.
- Passage type: full bore or reduced bore.
Considerations when installing the strainer (filter)
Correct installation is the starting point of trouble-free Strainer Installation and Maintenance; observe the requirements below.
For the connection elements on the installation
- They must be of a suitable standard, pressure class and diameter.
- The axes of the pipes to be installed and the hole axes of the connection element to be used must be on the same axis. Example: if a flange is used as the connection element, the bolt hole axes must be on the same axis. (Excessive stresses on the strainer caused by such axis misalignments will jeopardise the tightness.)
- In flanged connections, bolts suitable for the flange holes must be used.
- If the connection element is a flange, the gaps are first closed by tightening the bolts crosswise; the bolts are then tightened crosswise to the specified torque values.
- If a space is left for the strainer during installation, it must be calculated from the length of the strainer to be used and the thickness of the sealing elements.
- If the connection type is threaded, the thread length on the pipe must not be shorter than the thread length of the strainer.
Sealing element for strainer installation
Sealing elements are the most frequent item in Strainer Installation and Maintenance:
- A sealing element suitable for the fluid type and pressure must be selected.
- The surfaces of the sealing element to be used in flange connections must be smooth.
- A sealing element that has been dismantled or deformed must not be reused; a new one must be installed.
- When installing the sealing element, care must be taken not to obstruct the bore. (Sealing elements: Klingerit, PTFE, O-ring, rubber of suitable hardness.)
For strainer installation
The Strainer Installation and Maintenance instructions require the line to be clean before the unit goes in:
-
- Before installing the strainer, the line must be cleaned with compressed air or steam to remove any burrs, rust, foreign objects and dirt that may be present in the pipeline.
-
- The labels / covers on both flanges of the new strainer must be removed before installation.
For later Strainer Installation and Maintenance, the strainer is installed with the flange side carrying the technical information as the inlet. The other side is then connected to the installation without creating tensile stress.
Points to be considered when using strainer (filter)
The following operating points are taken from the Strainer Installation and Maintenance instructions:
-
- Remove the strainer from its packaging only when you are ready to connect it to the installation.
-
- The operating conditions are indicated on the strainer nameplate; the maximum working pressure is given in BAR.
- Periodic Strainer Installation and Maintenance: the filter must be cleaned periodically by removing the blind plug on the strainer cover.
-
- When connecting the strainer to the installation, make sure that the direction arrow points in the direction of flow.
Screen selection and open area
The screen is the working part of the unit, and choosing it correctly removes most of the later workload. Two figures describe it: the perforation or mesh size, which sets the smallest particle retained, and the open area, which is the total free area of all holes.
A finer screen catches more, but it also blocks faster and raises the pressure loss across the body. The usual approach is to select the coarsest screen that still protects the equipment downstream. A pump needs less protection than a control valve seat or a flow meter.
Open area is compared with the pipe bore rather than judged on its own. A screen whose open area is several times the pipe cross section keeps the pressure loss low even when partly loaded, so the line does not lose performance between two cleaning intervals. Screens with too little open area make Strainer Installation and Maintenance a weekly task instead of a scheduled one.
Installation orientation and blowdown connection
The pocket that holds the screen must be positioned according to the fluid. In horizontal liquid lines the pocket points downward, so that separated dirt collects at the bottom and leaves the flow path. In steam and gas lines the pocket is turned to the side, because a downward pocket fills with condensate and the screen then works under water.
In vertical lines the flow must run downward through the unit. An upward flow lifts the collected dirt back into the line every time the flow stops and starts.
Fitting a small valve to the drain plug is strongly recommended. With a blowdown valve in place, routine Strainer Installation and Maintenance can be carried out by opening the valve briefly under line pressure, and the cover only has to be removed for a full clean. On lines that cannot be shut down, this single fitting is the difference between a two-minute task and a shutdown.
When to clean: differential pressure
Strainer Installation and Maintenance intervals should not be guessed. The reliable indicator is the pressure difference between the inlet and the outlet, read from two gauges or from a single differential gauge fitted across the body.
Record the pressure difference when the unit is new and clean; this is the reference value. As the screen loads, the difference rises. A widely used rule is to clean when the difference reaches roughly twice the clean value, and never to let the line run at the maximum figure given by the manufacturer, because a heavily loaded screen can collapse.
The first weeks after commissioning are the heaviest. New pipework releases scale, welding slag and gasket fragments, so Strainer Installation and Maintenance is frequent at first and then settles into a longer interval once the line is clean.
Strainer Installation and Maintenance cleaning procedure
The full Strainer Installation and Maintenance clean follows a fixed order.
- Isolate the unit using the upstream and downstream valves, and confirm that both are closed.
- Depressurize the section and let the fluid cool to a temperature that can be handled safely.
- Drain the body through the blowdown valve or the drain plug, collecting the fluid where required.
- Remove the cover bolts evenly, in the reverse of the tightening sequence, and lift the cover clear.
- Withdraw the screen, wash it in a suitable solvent or with clean water, and blow it through from the inside outwards so that the dirt leaves the way it entered.
- Clean the body seat and the cover face, and check that no debris remains in the pocket.
- Fit a new gasket, refit the screen with its seating face in the correct position, and tighten the cover bolts evenly to the specified torque.
- Restore pressure slowly and check the cover joint for leaks before returning the line to service.
Reusing the cover gasket is the most common shortcut and the most common source of leaks afterwards. Treat the gasket as a consumable item of every Strainer Installation and Maintenance operation.
Screen inspection and replacement
During Strainer Installation and Maintenance the screen is inspected while it is out, not only cleaned. Look for tears, flattened areas, split seams and any deformation of the mesh, all of which let unfiltered fluid pass without any visible change in the line.
A screen that has collapsed inward has been run far past its allowed pressure difference. Cleaning it does not restore it, and a repaired or patched screen does not return to its original open area. Replace it and shorten the cleaning interval until the cause is understood.
Corrosion is checked at the same time. A screen material that is not compatible with the fluid thins gradually and fails without warning, so the material of the replacement should be confirmed against the service rather than assumed from the part in hand.
Safety precautions before opening
Every Strainer Installation and Maintenance operation begins with isolation. Confirm that the line is depressurized at the unit itself and not only at a remote gauge, and that no valve can be reopened while work is in progress.
Hot fluid is the main hazard. Let the body cool before loosening the cover, because a trapped pocket of hot liquid can flash to vapour as soon as the joint is broken. Loosen the last bolts carefully and allow any remaining pressure to release in a controlled way.
Use protective equipment appropriate to the fluid, and treat the collected dirt as contaminated with whatever the line carries. Where the medium is hazardous, the drained content is handled under the plant procedure for that fluid.
Maintenance records and intervals
A short record makes the interval self-correcting. Note the date, the pressure difference before cleaning, the condition of the screen and the gasket that was fitted.
After a few entries the pattern becomes visible: an interval that is always too short points to a screen that is too fine or to a problem upstream, while a screen that is still clean at every visit allows the interval to be extended. Planned Strainer Installation and Maintenance based on recorded values costs less than an unplanned stop caused by a blocked or collapsed screen.
Keep the record with the line documentation rather than with the unit itself. When a strainer is replaced or moved, the history of the position is more useful than the history of the part, because the dirt load belongs to the line. A Strainer Installation and Maintenance file held per position also shows whether an upstream repair has changed the loading, and the interval can then be set from evidence instead of habit.
Tools and materials to be used
Strainer Installation and Maintenance requires only a simple tool set: a double-ended wrench; bolts and nuts suitable for the connection.
Conclusion
If you want your installation to work properly, placing a strainer (filter) in the main circuits will reduce operating costs.
The strainer must be operated within the size and working pressure specified on the strainer in order to prevent possible leaks and operating costs.
Strainer Installation and Maintenance Documents
Download as PDF (English / Turkish)
